Dinuba High School

LOCATION:

Dinuba, CA

YEAR COMPLETED:

2020 (Estimated)

SIZE:

235,000 sq. ft.

COST OF CONSTRUCTION:

$76M

ARCHITECT:

SIM-PBK

PROJECT SUMMARY:

ASDi engineers provided the structural design for five core buildings on the new campus of Dinuba High School.  The project scope for ASDi consists of a new 10,000 sf Administration building, two two-story Classroom buildings totaling 83,000 sf, a 14,000 sf Gymnasium, and a 15,000 sf Locker building.  The Administration and Locker buildings are designed to utilize wood framing with I-joists and glu-lam beams, along with plywood bearing and shear walls.  The two-story Classroom buildings and Gymnasium are designed entirely out of steel.  These buildings consist of steel I-beams and metal deck, a concrete-topped second floor, metal stud walls, and steel ordinary concentric braced frames (OCBF) for the lateral system.  The Gymnasium boasts exposed, custom steel trusses spanning over 100 feet wall to wall.  This project is set to begin construction in late 2018.

Related Projects