Fresno High School

LOCATION:

Fresno, CA

YEAR COMPLETED:

2013

SIZE:

45,000 sq. ft.

COST OF CONSTRUCTION:

$17.6M

ARCHITECT:

TAM+CZ

PROJECT SUMMARY:

ASDi provided the structural engineering for two replacement buildings on the existing campus of Fresno High School.  The buildings are both two-story classrooms with a library media center and administration offices.  Each building is constructed of structural steel framing and OCBF lateral system.  One of the unique features of this project was matching the original architectural style of the campus and incorporating those features and finishes into the new buildings, such as the mansard roof profile and brick veneer.  The two new buildings are located along the front of the campus, adjacent to the historic Royce Hall.